« August 2007 << Main >> March 2009 »

Library Five

The tiles are grouted and ready to rock!

Slate Tile Finished

The remaining ceiling grid and lights are installed, and it is bright in the library! Brothers Dahlstrom and Quigley remove the carpet so new carpet can be installed.

Ceiling Finished Walls Done 1 Walls Done 2 Prepare Floor 1 Prepare Floor 2 Prepare Floor 3 Prepare Floor 4 Prepare Floor 5

Brother Dahlstrom crafts a new tool to assist in the preparation.

Awesome Lazyness

The carpet is installed and the library slowly begins to become a great study space once again.

Carpet Layout Carpet 1 Carpet 2 Carpet 3 Carpet 4 Finishing Up 1 Finishing Up 2 Computers Coming in

Posted by dahlstrom at 6:06 PM | TrackBack