« Library Three :: Main :: Library Five »

Library Four

The bottom half of the room is painted, and the tape pulled off, and the library is looking sharp!

Bottom taped 1 Bottom taped 2 Bottom untaped 1 Bottom untaped 2

The new tiling for the fireplace is planned out, soon to be installed

The corner sections and chair rails are getting ready for paint

Posted by dahlstrom at August 29, 2007 11:58 AM

Trackback Pings

TrackBack URL for this entry:
http://khkbeta.org/cgi-bin/mt/mt-tb.cgi/4